iDRY Vacuum Kilns

Sponsors:

A near miss

Started by Sawyerfortyish, January 22, 2007, 09:09:43 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Mooseherder

 There is a foot switch (electric deck) that moves the logs on the deck to the carriage/Headblocks.
It rolls on to the carriage from the log deck. I'm thinking there is enough room underneath the deck placed next to the carriage track. Everything else is on hydraulics, log dogs, set works, toe kicker and carriage. Adding more hydraulics shouldn't be an issue.  The 32ft. of tracks are set on 6x6 beams that will need to be replaced. Wood is rotten on one side.( about 1/3 of it) Steel would be nice option.

Thank You Sponsors!