On the tree farm that I own, there is a run that runs east/west from one side of the property to another. It is not useful to me. The acerage I own (62 acres) is a portion of the original farm (~200 acres) and I do not own the property where the road leads.

The road runs up a hill. At the top of the hill, the builders of the road cut into the dirt by 1-2 feet to reduce the road grade.

Looking at the profile of the ground (perpendicular to the road), it looks something like this: ----\___/----.

I would like to retire this road. The primary objective is to use the former roadbed for growing trees (it's approximately an acre). It would make the most sense to me to bring in some dirt to fill the roadbed to bring the topography back to the normal terrain.

I haven't done much dirtwork. I'll hire someone to haul in maybe 45 to 60 cubic yards of dirt and then someone with a piece of equipment to spread the dirt around. 

Has anyone done this, and any comments about how to do it right? I'm unfamiliar with dirt work.

Southside

I would probably dig into the bed to see if it has any fill before spending money on covering it up. If it is filled with rock or something like that it may not do well in tree growth. 
Franklin buncher and skidder
JD Processor
Woodmizer LT Super 70 and LT35 sawmill, KD250 kiln, BMS 250 sharpener and setter
Riehl Edger
Woodmaster 725 and 4000 planner and moulder
Enough cows to ensure there is no spare time.
White Oak Meadows

bigtrees

I think what you are saying is there is concern that the previous owner might have brought in low quality fill dirt to create the rock bed, and the low quality fill dirt will result in poor growing conditions for planted trees?

There are trees all around the roadbed, so the native soil supports growth. It is true that I have not dug into the roadbed to see if it is native soil or if poor quality fill was brought in.

Is there anything, within reasonable cost effectiveness, that I can do if there is low quality fill present? The former roadbed is a bit of an eyesore.

Here it is from a Google Maps aerial photo. The left and right side of the picture correspond to the eastern and western property boundaries. The former roadbed is the one that runs left/right in the picture. It is not the one that curves around in the bottom half.



Zooming in is a closer look at the roadbed.



TKehl

May be a dumb question, but is the road part of an easement to the other property?
In the long run, you make your own luck – good, bad, or indifferent. Loretta Lynn

bigtrees

Quote from: TKehl on August 14, 2018, 03:42:41 PM
May be a dumb question, but is the road part of an easement to the other property?
It's a good question, actually. Yup, it used to be an easement to the other property. It was pretty steep and made winter access difficult. Later the parcel owner obtained a second easement (the curvy road on the bottom half), and now the curvy road is the "official road." 

As part of my agreement to buy the property, I asked the seller to formally abandon the easement that the subject road is part of. They agreed and the abandonment is formally recorded with the county.

I don't want folks driving ATVs, etc, down it anymore. And it's ugly. Hence I why I would like to restore the topography and plant seedlings.

WV Sawmiller

   May be a dumb thought but if not covering a bunch of rock fill or such that would hinder growth, as mentioned above, why worry about the fill? I'd be tempted to just plow it up and plant it as it is. 
Howard Green
WM LT35HDG25(2015) , 2011 4WD F150 Ford Lariat PU, Kawasaki 650 ATV, Stihl 440 Chainsaw, homemade logging arch (w/custom built rear log dolly), JD 750 w/4' wide Bushhog brand FEL

Dad always said "You can shear a sheep a bunch of times but you can only skin him once

DPatton

Big trees,

How long is the cut portion of the roadbed? I'm asking because you said it's about 1' - 2' deep. At 18" in depth it would take 66+ cubic yards to fill a 12' wide section of road for just 100' in length. Not sure what your budget is but typically importing dirt is somewhat cost prohibitive unless you have the dirt to spare on site. 

If you do decide to haul in soil to fill the excavated area 60 cubic yards isn't that much dirt. That amount could easily be spread out and graded out by any decent operator with a medium to larger sized skidloader in a matter of a couple of hours.
TimberKing 1600, 30' gooseneck trailer, Chevy HD2500, Echo Chainsaw, 60" Logrite.

Work isn't so bad when you enjoy what your doing.
D & S Sawmill Services

Magicman

I suspect that you will have to break up the old roadbed to allow the tree roots to penetrate rather than meet the resistance of the compacted soil/fill and simple turn.  You could end up with an old roadbed covered with stunted trees.
Knothole Sawmill, LLC     '98 Wood-Mizer LT40SuperHydraulic   WM Million BF Club Member   WM Pro Sawyer Network

It's Weird being the Same Age as Old People

Never allow your "need" to make money to exceed your "desire" to provide quality service.....The Magicman

Southside

Magicman is spot on. I have a run of utility line on our farm and the ground under it was abused for 40 years, I have subsoiled it, disced it, planted nurse crops, and babied it for years now and it is just finially holding a good stand of grass. 

You mentioned that the road is steep, that presents an erosion issue too. If you fill or plow it up it would be a good idea to incorporate some water bars into the plan so you don't loose all your top soil.
Franklin buncher and skidder
JD Processor
Woodmizer LT Super 70 and LT35 sawmill, KD250 kiln, BMS 250 sharpener and setter
Riehl Edger
Woodmaster 725 and 4000 planner and moulder
Enough cows to ensure there is no spare time.
White Oak Meadows

r.man

I would vote for a test hole to see what you are dealing with. If the road builders just removed trees and drove over it then it is mostly a compaction issue but if they spread some sort of gravel then maybe it would be salvageable? Any chance the original soil is mounded up on one or both sides of the road? If it is still there a large hoe might do most of the decommissioning in one go, removing unwanted material, loosening what is left and respreading the original. Of course all of this hinges on a budget.
Life is too short or my list is too long, not sure which. Dec 2014

ST Ranch

Agree with RMan of possibly reclaiming the site by using a large [40 Ton +] excavator to rip and rehab the travelled road bed and possibly respreads some of the original top soil back onto the surface.
However as per others comments regarding current site stability/erosion issues, you may compromise this by digging up the site.  [i.e. trying to dig up top soil and ripping subsoil may increase erosion problems.]

If you are trying to stop atv traffic, digging up and planting a few trees will probably have limited success. 

In any case, less might be better than more, - just leave it alone or possibly consider skidding in some dead and down logs from the adjacent forest to create a bit of a physical barrier and fill plant [randomly plant] some hardy larger stock tree seedlings next to the log debris to slowly reclaim the site.

Tom
LT40G28 with mods,  Komatsu D37E crawler,
873 Bobcat with CWS log grapple,

mike_belben

If youre in clay soil then the builder almost certainly had to bring in shale or rock for a base.  Sandy soils maybe driveable as cut if the crown and ditching were pretty good.  Either way it looks like a pretty big project thatll likely take A LOT more fill than you think.  Maybe focus your efforts on filling and replanting only the entrance and putting up cable or mafia block if necessary.  

Praise The Lord

bigtrees

 Here's a picture of what I'm considering. The area of fill is relatively small. The blue line is the natural topography, the red line is the approximate current topography. I'll like to fill to bring the red line up to the blue line.

The cut is only at the top and, to a lesser extend, the tow of the slope. In between no cuts were made. I don't think it'd take much more than 60 yards to get it back to natural topography.


WV Sawmiller

   Why?

   Is the fill just for cosmetic reasons or is it draining or eroding there or something? Looks pretty stable in the picture to me.

    I'm not trying to be argumentative about it. If you want to restore it to original condition and do not have a more pressing need for your money, time, material and equipment then go for it.
Howard Green
WM LT35HDG25(2015) , 2011 4WD F150 Ford Lariat PU, Kawasaki 650 ATV, Stihl 440 Chainsaw, homemade logging arch (w/custom built rear log dolly), JD 750 w/4' wide Bushhog brand FEL

Dad always said "You can shear a sheep a bunch of times but you can only skin him once

Wudman

 I would put some brush piles in it to block ATV traffic and generate some "thicket habitat / escape cover".  I would let Mother Nature take it from there.  She will regenerate it for you.  But that may not be your objective so discount if not appropriate.

Wudman 
"You may tear down statues and burn buildings but you can't kill the spirit of patriots and when they've had enough this madness will end."
Charlie Daniels
July 4, 2020 (2 days before his death)

WV Sawmiller

Quote from: bigtrees on August 14, 2018, 01:12:42 PM
I would like to retire this road. The primary objective is to use the former roadbed for growing trees (it's approximately an acre). It would make the most sense to me to bring in some dirt to fill the roadbed to bring the topography back to the normal terrain.
My last post on this thread - I promise.

   If the true objective is to retire the road and use it for growing trees then all it appears you need to do is plow it up and plant trees. As mentioned above if the soil is greatly compacted it may take a dozer to plow deep enough to loosen the soil for the trees to grow well. If rock or other fill is a problem then other replacement/additional soil may be required otherwise nature will take over. If you want to block ATV traffic it can be done cheaper and easier. I ride my ATV on my place between trees like you show in your picture without issues so it would take more than blocking the old road to stop a dedicated/contrary rider.

  If you just want it to look like the rest of the terrain go ahead and bring in the fill. Good luck in your endeavors. WVS Out.

Howard Green
WM LT35HDG25(2015) , 2011 4WD F150 Ford Lariat PU, Kawasaki 650 ATV, Stihl 440 Chainsaw, homemade logging arch (w/custom built rear log dolly), JD 750 w/4' wide Bushhog brand FEL

Dad always said "You can shear a sheep a bunch of times but you can only skin him once

mike_belben

How many linear feet in length is that section you want to fill?  Looks like 2 or 3 feet deep by maybe 18 wide to me?  
Praise The Lord

gspren

It looks to me like the extra soil was pushed to the sides.
Stihl 041, 044 & 261, Kubota 400 RTV, Kubota BX 2670, Ferris Zero turn

curdog

I think I would leave it as is. Since this is a tree farm,  I'm assuming you will harvest timber sometime in the future. This road could be used for access with equipment either as a haul road or skid trail.  If it is planted and then you needed to use it for a harvest, you would destroy the younger planted trees in the process. I would also think that the difference in ages between the 1 acre of roadbed trees and the surrounding timber could create a dilemma for harvesting the younger planted trees since it will be a small area. 
But whatever you decide, good luck.  That's a nice looking property. 

bigtrees

 OK, I just got a bid on the job.

The bid estimated 360 yards of soil for the cut in the picture, plus a 100 yards for a couple other cuts not shown for a total of 460 yards. If I use 1/2 toposoil, 1/2 fill dirt, the cost total came to $11,000. About $8000 for material plus $3000 to spread it around and reseed afterwards.

Seems a little spendy to me, and the yardage estimate seems high (I readily agree that my original guess of 60 yards was not reasonable). But I'm probably looking at the vicinity of $8000 to $11000.

Would appreciate any comments folks have on the pricing of this job.


Plankton

Just wrote a reply but it didn't work so here's the short version. Yardage doesn't seem too crazy to me a tri axle of dirt can get lost in a hole that size fast. Unless the guys a scam artist and is trying to pull one over on you it's really easy to get the yardage needed very accurately just cubic ft to yrds. No idea on pricing I work in construction right now but never do any of the buying just the spreading and digging :) but doesn't seem too far off that's a lot of trucks. One way to save money would be to fill halfway with straight fill and the rest 50/50 depending on quality that should be more then enough to grow a few trees.

snowstorm

length x width x depth then add 20% for compaction. i know you dont want any but you will get some when its graded 

mike_belben

A triaxle disappears fast.  I hid 150 loads in 1 acre and still need more. 
Praise The Lord

teakwood

Quote from: snowstorm on August 29, 2018, 04:23:49 PM
length x width x depth then add 20% for compaction. i know you dont want any but you will get some when its graded
try 33% as compaction.  and yes a truckload is nothing. I have 4000 hours of big excavator experience and 20-30 loads don't get you that far. 
National Stihl Timbersports Champion Costa Rica 2018

bigtrees

Just want to circle back up on this discussion.

I found a contractor last fall that was interested in the work. By happenchance, he had a few hundred yards of quality topsoil that he wanted to sell at a reasonable price. After much engineering calculation, the total yardage required was 450 yards of dirt! Way over my original low 60 yard estimate.

To keep costs reasonable, the contractor brought in first 225 yards of pit run plain dirt, followed by 225 yards of topsoil. This created a 12" thick layer of topsoil on top of pit run. The contractor was careful to select pit run from a quarry that was close but also the quality of soil that we would need for this job.

We had the choice between a road grader or low ground pressure dozer. The dozer cost more since it couldn't be driven to the site. After much consideration, I felt that the low ground pressure dozer would be a better tool for the job, in particular because it would limit soil compaction.

After the work was completed, the contractor spread out 1000 pounds of hay along with grass and wildflower seeds.

I'm real pleased with the work. Perhaps I'll be able to post pictures here sometime in the future.

Next step - seedling planting next spring.

Jeff

Quote from: bigtrees on December 26, 2018, 09:42:15 AMPerhaps I'll be able to post pictures here sometime in the future.

Perhaps. That would be up to you.
Just call me the midget doctor.