The Forestry Forum is sponsored in part by:

Draw for handbuilt acoustic guitar get your name in


Forestry Forum
Sponsored by:


TimberKing Sawmills



Toll Free 1-800-582-0470

LogRite Tools



Norwood Industries Inc.


Sawmill & Woodlot Magazine



Your source for Portable Sawmills, Edgers, Resaws, Sharpeners, Setters, Bandsaw Blades and Sawmill Parts

EZ Boardwalk Sawmills. More Saw For Less Money!

STIHLDealers.com sponsored by Northeast STIHL


Woodland Sawmills

Peterson Swingmills

 KASCO SharpTech WoodMaxx Blades

Turbosawmill

Sawmill Exchange

BRUTE FORCE Authorized Dealer

Woodshax Outdoor Vending Solutions

FARMA


Council Tool

Baker Products

ECHO-Bearcat



Author Topic: Kiln Is Done... and it's about time.  (Read 3104 times)

0 Members and 1 Guest are viewing this topic.

Offline DR_Buck

  • Senior Member x2
  • *****
  • Posts: 2720
  • Age: 66
  • Location: Farmville VA
  • Gender: Male
  • Nuff said.....
    • Share Post
    • Got Logs?
Kiln Is Done... and it's about time.
« on: February 07, 2006, 09:44:32 PM »
Almost a year after buying the DH-4000 from Wood-Mizer, I finally got it up and going.   8) 8) 8) 8)


The kiln chamber is made from an old truck body I bought at an auction.   It came mounted on a trailer frame, which I left on it.  I did remove the tires and put it up on blocks.   

Because it was not insulated I had a lot of work to do to get it ready.   The interior walls were plywood over a 1 inch air gap.  I painted them with silver roof paint to waterproof them.  Then I had to build a raised floor so that I could get it insulated. and clear the wheel wells.   This took about 9 inches off of the height.   I covered the inside walls, floor and ceiling with 2" foam panels covered in poly film. 

The hardest part was replacing the roll-up rear door.  The roll-up just wouldn't work with the air baffles.



This is the outside view of the box.  The side walk-in door was already installed when I bought it.   The small panel is where the controller is mounted.  I didn't want it hanging on the outside of the box.



This is the DH-4000 control box and fan power switches.   It's insulated and waterproofed from both the inside and outside elements.    This is also a shot of my pathetic rear doors.   I may replace them with some tongue-and-groove made doors later.




This is outside looking in.   The lower 4 foot half of the walls is covered with aluminum I salvaged from our old swimming pool.  It protects the foam panels from being bashed by boards.     The raised floor is made from treated tongue-and-groove 2x6's.





This is the air baffles and kiln unit.   Air baffles are plywood and 2x4s holding the fans, with industrial tarps rolled up on 2 inch pvc pipe.   I use pullys and rope to raise and lower them.   In the right photo you can see the insulated box that houses the controller unit.



This is a close-up of the kiln unit and the controller box and a view from the inside looking out.





This is a view behind the air baffles  and looking out from inside with the side door open.

Hidden Acres Farm
Been there, done that.   Never got caught

Wood-Mizer LT40HDG38
Lucas Dedicated 60" Slabber

Offline Coon

  • Senior Member x2
  • *****
  • Posts: 2718
  • Age: 39
  • Location: Wynyard, Saskatchewan
  • Gender: Male
    • Share Post
Re: Kiln Is Done... and it's about time.
« Reply #1 on: February 08, 2006, 09:33:53 PM »
That is a sweet looking dry kiln.  Nice work. 8)  How many hours of work did it take to build?  How much hirachi ($$$) have you got into the complete project?   

What is the board footage that you can fit into the kiln and how long is it going to take to dry it down? 

Sorry for all of the questions but someday I would like to build myself a kiln.  I was thinkin of something along the lines of what you built but.......  Keep us posted on how well it works and all the little things you would have done different had you known then, what you know now.....

Brad.
Norwood Lumbermate 2000 w/Kohler,
Husqvarna, Stihl and, Jonsereds Saws

Offline Troy

  • Full Member x2
  • ***
  • Posts: 198
  • Age: 57
  • Location: Oak Grove, VA.
  • Gender: Male
  • Good help is hard to find!
    • Share Post
Re: Kiln Is Done... and it's about time.
« Reply #2 on: February 08, 2006, 09:55:27 PM »
Nice job Dr. Buck!  Have you got anything milled for you first charge?  Coon already asked my "how much will it hold" question...  Post some pictures of it when you have it loaded, should be an impressive sight!
Peterson ATS 8" 27hp

Offline DR_Buck

  • Senior Member x2
  • *****
  • Posts: 2720
  • Age: 66
  • Location: Farmville VA
  • Gender: Male
  • Nuff said.....
    • Share Post
    • Got Logs?
Re: Kiln Is Done... and it's about time.
« Reply #3 on: February 08, 2006, 11:06:49 PM »
The 1st load is cooking.   (See my other posting for DH-4000 Help).     

The inside dimensions are 7 1/2 wide, 7 high, 19 long.   It will hold about 2000 bf of 4/4 in a 48" wide stack.    I currently have around 1500 bf of partially air dried oak in it now.

Aside from the kiln unit, the biggest cost was the 2 inch foam board insulation.  The stuff is running over $27 for a 4x8 sheet.  It took 20 sheets to do the whole thing.   The truck box was $300 at an auction.   The treated T&G flooring was salvaged as "seconds' from another job and was free.  The aluminum inside walls were also free, salvaged from the side walls of an old above ground swimming pool.   I guess I have another $250 in miscellaneous stuff like switches, electric wire, circuit breakers and other hardware.    If I had it to do over again I would buy a refrigerator box with hinged doors on the back.

Coon -  I haven't got a clue how much time I have in it.   I spent more time avoiding working on it than I did actually doing the work!   :D

After loading the 1st load, I know I need to build a raised platform off the back end and a cart.    Got to find some wheels first. 
Hidden Acres Farm
Been there, done that.   Never got caught

Wood-Mizer LT40HDG38
Lucas Dedicated 60" Slabber

Offline iain

  • Senior Member x2
  • *****
  • Posts: 1231
  • Age: 56
  • Gender: Male
  • bonnin stuff
    • Share Post
    • Leafbone Furniture
Re: Kiln Is Done... and it's about time.
« Reply #4 on: February 09, 2006, 11:33:27 AM »
Way to cook them boards, dont forget the exit pics,

is the roll up to drop over the stack and direct air flow?

 because it looks mightily familiar, i also use heavy old blankets around the edges, and for any odd shape fill ins

iain

Offline oakiemac

  • Senior Member x2
  • *****
  • Posts: 1460
  • Location: south west Michigan
  • Gender: Male
  • God bless the U.S.A!
    • Share Post
    • Hickoryandoak
Re: Kiln Is Done... and it's about time.
« Reply #5 on: February 09, 2006, 12:33:38 PM »
I also built my kiln from a shipping container. It looks a lot like yours except my fans are directly under the compressor unit and they blow over the stack of lumber and then through the lumber and back to the kiln unit. Is the way you have it how Nyle recommended to build? I built mine using Ebacs directions because it used to have a Ebac in the kiln but I switched to Nyle for the large kiln.
Mobile Demension sawmill, Bobcat 873 loader, 3 dry kilns and a long "to do" list.

Offline getoverit

  • Senior Member x2
  • *****
  • Posts: 1831
  • Age: 61
  • Location: Murfreesboro, Tennessee
  • Gender: Male
  • freeing trees from silence
    • Share Post
Re: Kiln Is Done... and it's about time.
« Reply #6 on: February 09, 2006, 10:55:02 PM »
Beautiful job on the Kiln !! It has given me some good ideas and suggestions on how I would want to build mine when the time comes.

I dont know what part of the country you are in, but I could use those 30 sheets of OSB, if the price is right and you are within driving distance.
I'm a lumberjack and I'm ok, I work all night and sleep all day


Share via delicious Share via digg Share via facebook Share via linkedin Share via pinterest Share via reddit Share via stumble Share via tumblr Share via twitter

xx
time before getting to kiln

Started by woeboy on Drying and Processing

7 Replies
1596 Views
Last post June 08, 2010, 03:13:40 PM
by Doug_D
xx
Drying time in Serg and Den vac kiln

Started by rerednaw on Drying and Processing

1 Replies
1025 Views
Last post February 02, 2005, 02:33:23 PM
by serg
xx
Solar kiln this time of year

Started by vfauto on Drying and Processing

3 Replies
480 Views
Last post January 06, 2018, 06:41:11 PM
by vfauto
xx
Cycle time for Solar Kiln

Started by VA-Sawyer on Drying and Processing

4 Replies
2062 Views
Last post January 30, 2004, 05:56:15 PM
by Carl_B
 