The Forestry Forum is sponsored in part by:

iDRY Vacuum Kilns


Forestry Forum
Sponsored by:


TimberKing Sawmills



Toll Free 1-800-582-0470

LogRite Tools



Norwood Industries Inc.




Your source for Portable Sawmills, Edgers, Resaws, Sharpeners, Setters, Bandsaw Blades and Sawmill Parts

EZ Boardwalk Sawmills. More Saw For Less Money!

STIHLDealers.com sponsored by Northeast STIHL


Woodland Sawmills

Peterson Swingmills

 KASCO SharpTech WoodMaxx Blades

Turbosawmill

Sawmill Exchange

Michigan Firewood, your BRUTE FORCE Authorized Dealer

FARMA


Baker Products

ECHO-Bearcat

iDRY Wood Lumber Vacuum Drying for everyon

Nyle Kiln Dry Systems




Author Topic: First Mobile Job  (Read 1133 times)

0 Members and 1 Guest are viewing this topic.

Offline 123maxbars

  • Senior Member
  • ****
  • Posts: 594
  • Age: 39
  • Location: Kingsport, TN
  • Gender: Male
    • Share Post
    • www.outofthewoodsforestry.com
First Mobile Job
« on: November 04, 2011, 09:06:07 PM »
Hello, just wanted to update the board on my first mobile sawmill job. I have a LT28 with the log deck package. I have had the mill for about two months now. I have stayed busy cutting logs that people bring to me and have made more from it that I thought I would. I placed a local add and never a day passes that my phone rings. But I have learned that out of every five people that call, two of them will actually either bring you logs, or show up to buy your lumber. I am a police officer so this is my hobby that more that pays for its self which was my goal. I have a good set up on my property with a drive way separate from my house that goes to my mill. I have a good shelter for it and a Kubota tractor with forks for log handling. Anyways, I did my first mobile job this week at farm a few miles from me. I charged the customer 250 per thous. He wanted random width 4x4 siding. I got there to find the logs were nicely stacked but that were on a down hill slope. I had to position my mill (which was the only place I could place it) above the logs. That meant as I winched them up on the mill they were not on level ground, it was light winching them up hill just to get them on the mill. And the customer was at work so I was out of luck and just had to deal with it. I got half his logs milled before I had to move to another pile and got all of them milled. Anyways i milled 1kboard feet for the guy, but had a terrible time loading them. Lesson learned was to tell the customer that level means level and dont have the logs staged down hill from the mill.  It was at least a 2 foot drop on elevation from where the mill was to the logs. I had a few logs fall off while trying to winch them on the deck. Anyways I learned a lot and enjoyed making money with my hobby despite the log placements. I told the guy I would come back and do the rest of the logs if he moved them either up hill from the mill or a tleast on a level area.  Anyways, mobile jobs are good for the money, but I hope to do most of my milling at home. 
Sawyer/Woodworker/Timber Harvester
W/M LT40HD, W/M KD150 Dehumidification Kiln Mahindra 4550, BMS 250 Sharpener, BMT 150 Setter, MS880 chainsaw mill,
outofthewoods
Youtube page
Out of the

Offline zopi

  • Senior Member x2
  • *****
  • Posts: 3009
  • Location: Virginia
  • Gender: Male
    • Share Post
Re: First Mobile Job
« Reply #1 on: November 04, 2011, 09:15:40 PM »
A hilift farm jack is often helpful in adjusting the logs on the ramp...I am contemplating a cable harness that extends just shy of the end of the ramps..to keep the logs from pivoting on the ramps...
Glad to hear you are getting some business!
Got Wood?
LT-15G GO chassis added.
WM sharpener and setter
And lots of junk.

Offline cypresskayaksllc

  • Senior Member
  • ****
  • Posts: 340
  • Age: 37
  • Location: Live Oak FL
  • Gender: Male
    • Share Post
    • Cypress Kayaks LLC
Re: First Mobile Job
« Reply #2 on: November 05, 2011, 12:45:41 AM »
It could have been worse ;D
LT40HDDR, JD950FEL, Weimaraner

Offline Piston

  • Senior Member x2
  • *****
  • Posts: 1811
  • Age: 38
  • Location: Upton, MA
  • Gender: Male
  • ...Brick by brick my friends...brick by brick!
    • Share Post
Re: First Mobile Job
« Reply #3 on: November 05, 2011, 03:48:17 AM »
That's great your getting some business and a litte profit for your hobby.  Seems like a lot of guys start out just like you  ;D

I was thinking of getting the LT28 to replace the LT15 I have and asked some advice from the forum.  Jim Rogers sent me a packet that had some really useful information on it.  He made up a short general overview that he sends to his customers and it explained, in easy to understand terms and drawings, what he expected when he arrived at the site.  You might send him a message and see if he would share it with you. 

How are you liking the LT28?  I still think about upgrading when the time is right  ;D
-Matt
What the Lion is to the Cat the Mastiff is to the Dog, the noblest of the family; he stands alone, and all others sink before him. His courage does not exceed his temper and generosity, and in attachment he equals the kindest of his race.


Share via delicious Share via digg Share via facebook Share via linkedin Share via pinterest Share via reddit Share via stumble Share via tumblr Share via twitter

xx
How Mobile is the Mobile Dimension Mill?

Started by Mulekicker on Sawmills and Milling

11 Replies
2581 Views
Last post June 20, 2015, 07:38:32 AM
by dgdrls
xx
Mobile Dimension - Mobile MFG

Started by willysjeeps on Sawmills and Milling

12 Replies
2276 Views
Last post October 31, 2017, 10:24:29 AM
by DanG
xx
My LT-10 is now mobile!

Started by francismilker on Sawmills and Milling

19 Replies
1748 Views
Last post March 14, 2013, 12:28:16 PM
by francismilker
xx
First mobile job

Started by Chaser357 on Sawmills and Milling

11 Replies
998 Views
Last post April 10, 2018, 11:56:40 PM
by Skipper11A
 


Powered by EzPortal