The Forestry Forum is sponsored in part by:

iDRY Vacuum Kilns


Forestry Forum
Sponsored by:


TimberKing Sawmills



Toll Free 1-800-582-0470

LogRite Tools



Norwood Industries Inc.




Your source for Portable Sawmills, Edgers, Resaws, Sharpeners, Setters, Bandsaw Blades and Sawmill Parts

EZ Boardwalk Sawmills. More Saw For Less Money!

STIHLDealers.com sponsored by Northeast STIHL


Woodland Sawmills

Peterson Swingmills

 KASCO SharpTech WoodMaxx Blades

Turbosawmill

Sawmill Exchange

Michigan Firewood, your BRUTE FORCE Authorized Dealer

FARMA


Baker Products

ECHO-Bearcat

iDRY Wood Lumber Vacuum Drying for everyon

Baltic Abrasives Technologies Nyle Kiln Dry Systems




Author Topic: need help w/ conservative dry scheduals  (Read 1184 times)

0 Members and 1 Guest are viewing this topic.

Offline Jay_C

  • Member*
  • *
  • Posts: 1
  • I need to edit my profile!
    • Share Post
need help w/ conservative dry scheduals
« on: March 12, 2004, 06:27:10 AM »
 ??? I am drying my first load of  dead green white oak and made the mistake of assuming that if I followed the scheduals I would be safe.Well the first two days I lost 3% and 2.9% and developed some small checks.The books say that a very conservative schedual must be followed for the remainder of the charge but are vague on just what that means.Does anyone have any advice on the appropriate depression, temp adjustments,and safe %mc loss/day in this situation?  Thanks

Offline beenthere

  • Senior Member x2
  • *****
  • Posts: 26932
  • Location: Southern Wisconsin, USA
  • Gender: Male
    • Share Post
Re: need help w/ conservative dry scheduals
« Reply #1 on: March 12, 2004, 06:41:51 AM »
What was the schedule that you followed that dropped the mc that much?  

Many times, with oak, the surface damage is done within hours (minutes in the sun) after sawing. If I remember right, the surface must be kept free of air movement and almost the equivalent of being sprayed with water. It is tough to avoid surface checks in the initial stages of drying oak. Then as the drying progresses, the surface checks close and are never seen again until after drying is complete, and the finishing begins.
south central Wisconsin
 It may be that my sole purpose in life is simply to serve as a warning to others

Offline Den Socling

  • Senior Member x2
  • *****
  • Posts: 4217
  • Age: 68
  • Location: Jersey Shore, Pennsylvania
  • Gender: Male
  • just wondering
    • Share Post
Re: need help w/ conservative dry scheduals
« Reply #2 on: March 12, 2004, 07:05:20 AM »
And, if the surface checks are not too deep, you won't have enough internal stress to cause problems when the core comes dry.

What are you using for a kiln? for sensors? What you need to do is keep the temperature low but keep the humidity high (wet bulb depression low).

Bake samples and watch the MC difference between shell and core.


Share via delicious Share via digg Share via facebook Share via linkedin Share via pinterest Share via reddit Share via stumble Share via tumblr Share via twitter
 