The Forestry Forum is sponsored in part by:


Forestry Forum
Sponsored by:


TimberKing Sawmills



Toll Free 1-800-582-0470

LogRite Tools



Norwood Industries Inc.


Sawmill & Woodlot Magazine



Your source for Portable Sawmills, Edgers, Resaws, Sharpeners, Setters, Bandsaw Blades and Sawmill Parts

EZ Boardwalk Sawmills. More Saw For Less Money!

STIHLDealers.com sponsored by Northeast STIHL


Woodland Sawmills

Peterson Swingmills

 KASCO SharpTech WoodMaxx Blades

Turbosawmill

Sawmill Exchange

BRUTE FORCE Authorized Dealer

Woodshax Outdoor Vending Solutions

FARMA


Council Tool

Baker Products

ECHO-Bearcat

Arborwear



Author Topic: TF Wiring Question (vertically behind a post)  (Read 395 times)

0 Members and 1 Guest are viewing this topic.

Offline jb9

  • Full Member
  • **
  • Posts: 55
  • I'm new!
    • Share Post
TF Wiring Question (vertically behind a post)
« on: January 24, 2017, 11:33:34 PM »
Hello,

I searched the forum and didn't find the answer I was seeking so I will ask a question here.  I know it is common to put a strip of 5/8" strapping on the outside of a post so that a SIP panel can allow a 1/2" sheet of drywall to slip in behind the post.  I am planning on running romex behind my posts horizontally and using a baseboard to hide my horizontal runs of wire.  I am however curious to know if I can run romex vertically on the back of a post up to a 2nd floor location.  I know it's not a huge cavity and I don't know if it could be planned out during the SIP installation but I thought I would ask.  I am aware of the code requirement for staples at a specified length but I wasn't sure if that was for horizontal runs only.

I have attached a picture that hopefully describes what I am asking.

Thanks.


Offline ljohnsaw

  • Senior Member x2
  • *****
  • Posts: 3027
  • Age: 58
  • Location: Northern California
  • Gender: Male
  • Happily retired... Working harder than ever!
    • Share Post
Re: TF Wiring Question (vertically behind a post)
« Reply #1 on: January 25, 2017, 01:54:02 AM »
I think you might run into problems.  Code might dictate that you have nailing strips/protection.  Steel covering the wires so that they don't get hit when you are nailing the SIPs in place.  I'd probably make a bit of a groove in the back of the post (1/8"+/-) so that I could place a 3/4" conduit with sweeps on the ends.  Then you could slide wires in after the SIPs are in place and before the drywall goes up.
John Sawicky

Just North-East of Sacramento...

SkyTrak 9038, Davis Little Monster backhoe, Case 16+4 Trencher, Home Built 38" cut Bandmill up to 64' - using it all to build a timber frame cabin.

Offline logman

  • Senior Member
  • ****
  • Posts: 286
  • Age: 60
  • Location: Fleetwood, NC
  • Gender: Male
  • I need to edit my profile!
    • Share Post
    • M&K Timber Works
Re: TF Wiring Question (vertically behind a post)
« Reply #2 on: January 25, 2017, 08:11:43 AM »
I did that on both timber frame homes I've built for ourselves with no problems.  Both passed electrical inspections.  I wired them after the sips were on so there was no danger of hitting the wires with screws.
LT40HD, 12' ext, 5105 JD tractor
M&K Timber Works


Share via delicious Share via digg Share via facebook Share via linkedin Share via pinterest Share via reddit Share via stumble Share via tumblr Share via twitter

xx
wiring question

Started by Dan_Shade on General Board

10 Replies
1318 Views
Last post January 08, 2009, 05:34:35 AM
by Dana
xx
Wiring question??

Started by Josh3760 on Sawmills and Milling

34 Replies
4174 Views
Last post January 10, 2016, 08:25:15 PM
by dean herring
xx
Storing a hydraulic log splitter vertically?

Started by Warbird on General Board

7 Replies
1555 Views
Last post October 23, 2007, 03:36:30 PM
by breederman
xx
Winch wiring question for trailer

Started by Jeff on General Board

26 Replies
4560 Views
Last post September 24, 2005, 02:01:55 PM
by rebocardo
 


Powered by EzPortal