17'LVL beam sawmill shed opening

Started by LarryG, December 10, 2020, 09:49:55 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

LarryG

I was thinking of using 3ply LVL beam for the main opening on my sawmill shed. Is this a good or bad thought to have the middle LVL longer to be the tenon going into a post. 
Woodland Mills 126
Yanmar 424 Tractor

DR Buck

I used two 16" x 2.5"  21 foot LVLs for the opening under my over hang where the sawmill sets.   The only caution I would make is the cover the exposed side/ends of the LVL to protect them from weather.    They are not designed for prolonged exposure to the outside (rain/snow/etc) .  I'm covering mine with metal to match my building.
Been there, done that.   Never got caught [/b]
Retired and not doing much anymore and still not getting caught

Lostinmn

I'm using LVLs on my mill shed loading side, but each end full has a full jack post supporting it. If you do as you described, I'd also have each end fully sitting on jack posts too. 