iDRY Vacuum Kilns

Sponsors:

sawmill shed almost done

Started by forrestM, May 22, 2019, 12:50:16 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

forrestM

Hey There,

just wanted to share progress on my sawmill shed! got the roof on today. just have to get some braces side to side and front to back.

it measures 22' long and 15' wide about 12' tall in the front and 8' in the back. 

my mill is sitting on a 8'x20' concrete pad, each leg supported with a solid 8" concrete block. 

used to live under a tarp on a gravel driveway - excited to start cutting under the roof. 

Next steps are to build a log deck in front, and get a meter base on a pole behind the shed. I will probably put a wall on the back side and might hook up a blower to keep the dust outside. 

would love to trade in my lt15 for an lt15 wide electric any day now - but i guess ill cut with this for a while longer! 


Thanks,
Forrest

 

 



Bruno of NH

Lt 40 wide with 38hp gas and command controls , F350 4x4 dump and lot of contracting tools

frazman

Nice work. I like the 2 pieces of clear panels on the roof. Should give good light. 

How thick is the concrete pad ?

busenitzcww

Looks awesome! Just got my LT 15 wide electric and loving it! Electric is sooooo much more quiet! Now I need to use it a while and figure out how I want it oriented and then get a pad/roof like you!

Den-Den

Very nice.  I like the clean simple design.  (would not wait long before putting braces on)
You may think that you can or may think you can't; either way, you are right.

boonesyard

Looks good. I'm just starting our build as well and I know I have other considerations like snow load, etc. (not sure where you're located) but I was curious about the size and construction of the 22' beam across the front? 
LT50 wide
Riehl Steel Edger
iDRY Standard kiln
BMS 250/BMT 250
JD 4520 w/FEL
Cat TH255 Telehandler
lots of support equipment and not enough time

"I ain't here for a long time, I'm here for a good time"

forrestM

The concrete pad was made with 2x6 forms so it is roughly 5-1/2" thick. 

It is a 3/12 pitch roof.

The beam is made of two 22' long LVLs. They are each 1-3/4"x14"

Got the braces on today. Still has slight motion. Hopefully the wall in the back will stiffen it up more.


Don P

@boonesyard;
Page 29 of this link is a typical span table for lvl's, the supplier can dial it in for you;
https://www.bc.com/content/uploads/2018/09/W-spec-guide-BCI-and-VL.pdf

Don't forget up especially with an open roof (kite!) use hurricane ties from each rafter to the beam at each end, connect the beams to the posts well and from posts to footing or nail some cleats across the posts underground so it has to pull a big slug of soil out to extract them. Nailing a triangle of plywood across beam, post, and brace locks the braces up well.

boonesyard

LT50 wide
Riehl Steel Edger
iDRY Standard kiln
BMS 250/BMT 250
JD 4520 w/FEL
Cat TH255 Telehandler
lots of support equipment and not enough time

"I ain't here for a long time, I'm here for a good time"

Thank You Sponsors!