iDRY Vacuum Kilns

Sponsors:

What are they making?

Started by Cedarman, August 30, 2012, 02:12:18 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Cedarman

We get unusual cutlists all the time.  All ERC.
Latest:
6  2x4x10  full size no planing
2 2x6x10
4 2x8 x10
1 2x12 x 8
1 4x4x8

Will go on top of 40' pole as an osprey platform.
They sent the money, we sent the wood.
Shipping was 40% of the cost.
Government funded.
I am in the pink when sawing cedar.

fishpharmer

Cedarman, glad to see you doing your part to help with government housing. ;) ;D
Built my own band mill with the help of Forestry Forum. 
Lucas 618 with 50" slabber
WoodmizerLT-40 Super Hydraulic
Deere 5065E mfwd w/553 loader

The reason a lot of people do not recognize opportunity is because it usually goes around wearing overalls looking like hard work. --Tom A. Edison

pigman

I wouldn't think that material would be heavy enough to supprt one of those large twin rotor flying machines. Or maybe it was for the bird. :-[
Things turn out best for people who make the best of how things turn out.

Magicman

We saw several of those platforms North of Orange Beach Al, this Summer.
Knothole Sawmill, LLC     '98 Wood-Mizer LT40SuperHydraulic   WM Million BF Club Member   WM Pro Sawyer Network

It's Weird being the Same Age as Old People

Never allow your "need" to make money to exceed your "desire" to provide quality service.....The Magicman

Raider Bill

We have them all over the place down here.
The First 70 years of childhood is always the hardest.

Burlkraft

Quote from: Raider Bill on August 30, 2012, 04:47:05 PM
We have them all over the place down here.

Govenment nests or birds?
Why not just 1 pain free day?

Raider Bill

The First 70 years of childhood is always the hardest.

Slabs

Florida has a large Osprey population.  They have occupied a few microwave towers that the Air Force owned and chose to abandon in favor of the birds.  Some tall posts were erected and boxes were provided for nests which were accepted by the birds.
Slabs  : Offloader, slab and sawdust Mexican, mill mechanic and electrician, general flunky.  Woodshop, metal woorking shop and electronics shop.

Cedarman

Just had a new request for quote.
1000  3 1/2" x 3 1/2" x 8' cut into 4' pieces.  2000 altogether.  They are going to put the post into a steel bracket so it stands vertically and then hang a sign for a companies beer.  These signs will be in retail outlets.
If we get the job.
I asked if I could get some beer out of this deal and they said they were just the sign makers.  I would have to take that up with the beer company.
I am in the pink when sawing cedar.

Brucer

I had an order from afar where the shipping was more than 40% of the total cost. The customer couldn't get the product he wanted locally -- he priced out the local alternatives and the delivered cost of my product was less.

As for "What are they making?", here's one I received last week:

1 - beam 6x8x10'
7 - posts 6x6x8'
1 - brace 4x4x8'

Huh? 7 posts to hold up one 10' beam ???.

I happened to see the project today. It's for a roof over an entryway.

4 - 6x6x8' posts to support the roof.
2 - 6x6x8' "posts" were actually beams supported by the posts.
1 - 6x6x5' cut from the 7th "post" was a tie connecting the 6x6 beams.
1 - 6x6x3' cut from the 7th "post" was a king post resting on the tie.
1 - 6x8x10' ridge beam resting on the king post at one end and the building  roof at the other end.
4 - 4x4x2' braces.

Bruce    LT40HDG28 bandsaw
"Complex problems have simple, easy to understand wrong answers."

Thank You Sponsors!