The Forestry Forum is sponsored in part by:
0 Members and 1 Guest are viewing this topic.
I did rotate it in my gallery, but how do I fix it in the post?
1 or 2 more days, then I think I'll be back to working on my sawmill (again). I had cooler weather so I packed a bunch of syrup from barrels into jugs. The temperature were manageable when I had a 16" fan aimed at my work station at the bottler. I still have 7 more gallons to pack, after I take a bunch of syrup to my only local retail outlet tomorrow (they were very low in stock). Restocking will take 1.5-2 hrs, then I'll pack the remainder, after which I can get back to the sawmill. I've had it since 7/30, still not done. In that time I only have 7-8 hrs actually into it.Pictures to come.
Started by Rene S on Sawmills and Milling
Started by Ventryjr on Sawmills and Milling
Started by Hemlock121 on Sawmills and Milling
Started by beenthere on General Board