iDRY Vacuum Kilns

Sponsors:

New Saw Barn

Started by chet, November 06, 2004, 03:20:48 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Ernie

Great Shed Chet.

I knew all those jokes couldn't be true :) :)

When does the floor go down?
A very wise man once told me . Grand children are great, we should have had them first

Sunfield Hardwood

Nice shed Chet, I've just added on to my mill shed, I poured a slab,layed a course of blocks around outside wall and built on that, the reason being so I could use my own lumber for posts, Tell me more about getting your lumber treated ;D
2 international log trucks,woodmizer LT40 Super hyd, cat 910 frontloader, case 1845 skidloader,new holland 4x4 tracter with farmi whinch, lots of stihl saws, waiting to retire so I can spend even more time logging and sawing, yip-yip-yahoo

chet

I take my wood to a treatment facility about an hour from me. Usually a couple thousand feet at a time. Getting it there isn't bad, but bringing it home after treatment it's real heavy. Treating posts to .60 costs me $140 mbf.
I am a true TREE HUGGER, if I didnt I would fall out!  chet the RETIRED arborist

lamar

chet, I hauld about 3200 last time. All I could see was a wall of lumber I never got my cummins into 5th gear didnt want to go over 50 max. I think I was a bit overloaded but once I got it loaded I had to try it. Now This guy lets me leave my treated lumber dry down as long as I want. I still made 2 trips bringing it home.

Thank You Sponsors!