The Forestry Forum

General Forestry => Sawmills and Milling => Topic started by: jrokusek on February 27, 2005, 03:19:14 PM

Title: Another bandmill track question
Post by: jrokusek on February 27, 2005, 03:19:14 PM
I've been watching the thread called "making a track for a bandmill" for a few days.  I'm building a bandmill for hobby use also.  For the track I was thinking of using 3x3 angle iron.  Can I use 3/16" thick or should I step up to 1/4". 

My intent is to make it stationary, but moveable should the need arise.  If I build two sections, each 8 feet long.......think a guy could drag each section up on a tilting snowmobile trailer by himself?   I have no desire to put an axle under this thing.  I think it would have to be built a lot more stout than what I have in mind.

Jim
Title: Re: Another bandmill track question
Post by: Dan_Shade on February 27, 2005, 03:51:17 PM
what you'll run into is my problem with the hudson track... it's a major hassle to get it leveled.

if you do that and get some 6x6 timbers cut to go under it, you'll be in good shape, probably.

it's a very cost effective way to set up a sawmill, but it's definately a pain to do it.
Title: Re: Another bandmill track question
Post by: thecfarm on February 27, 2005, 06:27:43 PM
Depends on how big of logs you plan on sawing I would think.I have 4x4  1/4 angle iron  for a track  and there is more iron under the angle iron.I've never had any trouble with it yet.I always like to build-buy bigger than what I need.But I can see your point about moving it.I feel if someone whats me to saw for them,they will get the logs to me.I have no wheels for mine.
Title: Re: Another bandmill track question
Post by: music_boy on February 27, 2005, 06:33:36 PM
     My suggestion is,  put it on a trailer. Once you have the mill tracks leveled and welded on place, it shouldn't  change. Then, your trailer could be slightly off level one way or the other, but your tracks are still true to the saw carraige. I'm sure someone more creative than myself has come up with a way to have the best of both worlds on this one; true tracks on the ground with leveling a trailer frame, and the ability to to put the same frame on wheels to move. If not, my suggestion would be to have a trailer and a separate ground site.
My thoughts
Rick
Title: Re: Another bandmill track question
Post by: jrokusek on February 28, 2005, 09:30:23 PM
Not a lot of big logs here on the plains of South Dakota. :'(  Now you got me thinking that I should have a stationary frame and one that I can tow.  Think I beter focus on one thing at a time.  Thanks for the responses!

Jim
Title: Re: Another bandmill track question
Post by: D._Frederick on February 28, 2005, 11:35:02 PM
J.,

I would go to the 1/4 inch thick angle, you will have less problem with it springing. If you are going to move it around, I think that I would build the track frame out tubing, you will have a lot easier time leveling it. Making the tack in sections results in a lot more time in getting the track level and straight.  I went that way with my mill having 10 ft by 3X4 angle track sections, it was a bear to set-up. I ended up adding 6 inch by 20 ft channel iron to the track to hold the sections in place.