do i need to seal the bottom side of the flooring or is a moisture barrier sufficient? im installing kiln dried SYP on a first floor with an unfinished basement below.

thanks

will
Machinist, WM LT15 230 JD skidsteer 2010 JD 2955 JD Jonsered chainsaw

sprucebunny

Knowing what I know now, I would seal all 4 sides and use a vapor barrier. It changes size with the season. Wider spaces between the boards in winter trap dirt and dog hair when they get smaller in the summer. I have 4" boards so the cupping isn't too bad. Tar paper should make it squeak less.

This seasonal change may be less for you since your heating season is shorter/less intense.
MS193, MS192 and an 026  Weeding and Thinning. Gilbert Champion sawmill