progress pictures on my bandmill build

Started by bruce29, February 16, 2012, 09:32:04 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

bruce29

Thank you for all the responses I have put alot of thought effort, and too much time in this project. I hope it will all be worth it I welded the teeth into the chain. Here are the hydraulic controls LEVERS from left to right:

1. First clamp four-way joystick up and down, and in and out.
2. Third loader arm farthest from operator.
3. The first loader arms synchronized by valve.
4. Second clamp four-way joystick up and down , and in and out.
5. Head travels forward and reverse detent valve, there is a flow control valve located directly in front of this valve.
6. Chain turner four-way joystick to control up and down and direction of rotation.
7. First taper roller.
8. Second taper roller.
9. Third taper roller.
10. Backstops up and down.
I know this seems like alot of controls , but it works well for me. I isolated the second clamp controls after first trying them on one valve.